Steel Fabrication - Briscarb

This project involved around 200 tons of fabricated steelwork and we produced all of the detailed design drawings for this project. 

Once on site the installation of all of the supporting steelwork, platforms, walkways and all mechanical items plus site CDM were handled by our experienced workforce.

Corus High Level Gas Main - Piping installation

The client had a requirement for large scale gas mains (1.1m diameter) to be manufactured and installed over a 1600m distance.  The pipe work was fabricated in workshops on site by our workforce and our in-house design team were able to provide all the support and structural calculations before submitting their drawings to Corus for approval.  A Corus chemical engineer gave their specifications to us and we designed all the gas flow expansion calculations and the majority of the design calculations for this job.