Welcome to Grayton Engineering

Grayton Engineering Ltd provide a wealth of experience in structural and mechanical engineering. Our team have provided 15 years of excellence and continue to provide engineering services to many blue chip clients.
 

Grayton Engineering provide the following services:

 

Engineering Services

Our team of skilled engineers work nationwide and from our full fitted workshop to carry out numerous engineering projects which often involve:-

  • Fabrication
  • Mechanical plant Installation
  • Removal and Refurbishment of Redundant Plant and Equipment
  • Specialised machinery and Production Plant build and commissioning
  • Installation and Relocation services
  • Production of specialist hard plate
  • Specialist Cement Kiln refurbishment and relocation

Project Management

Our experience means we have coordinated projects of all types and sizes and controlled them efficiently and in accordance with current codes of practice and legislation. Whatever the size of project our team ensure it is efficiently managed from start to completion fulfilling individual project requirements to agreed timescales, budgets and other commercial constraints.

 

Hire of Skilled Personnel

Through our subsidiary "Kestrel Engineering" we can provide skilled, safety certified and qualified staff to carry out project specific and continual maintenance services.

Production Plant Build

We worked closely with FLSmidth on this project - FLSmidth supplied all the mechanical equipment and we carried out all the installation work for Plasmor.

This project required a pair of kilns with a total length of around 50m, weighing around 100 tons to be supplied and installed. Although access on the site was good, moving the 100 ton sections to the installation point created its own problems. A new road had to be built on site to get the kilns to their final destination.

Refurbish tyre at Castle Cement

As this job involved a cracked tyre it had to be treated as a priority case. The tyre needed replacing with minimum downtime to reduce lost production time as we are well aware that any lost time in this industry can be very costly. The existing shell needed to be supported and cut, to enable removal and replacement of the tyre on that section of the kiln.

The tyre was cracked in several places and this made its replacement a priority To keep the kiln circular during the lift and period of being stationary support spiders were built in three places With a very congested workspace the skills of the lift team were essential
A cracked tyre needed replacing. Support spiders were put in place. Grayton provided the specialists.

We encountered different challenges on this project - we needed a highly specialised lift to get the tyre into position on site and we had to design specialist lugs to assist with lifting the tyre off.